Skip to content
FieldWorksHQ

Item standard

ATCO Electric CMS Drawing 6-2 Pole Metering for Oilfield Loads Over 200 A and Greater 300 V Phase to Phase

Published by ATCO Electric Ltd.

Suggested unit

Each

Current version

Revised September 2025

Official source
civilelectricallandscapewater-wastewatermeteringdrawingelectrical serviceclearancepoleoilfieldloadsover200greater300phase

Related standards from ATCO Electric Ltd.

View ATCO Electric Ltd.'s full publisher profile

Reference only. Always verify before you specify.

This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.

Put this standard to work.

This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.