Skip to content
FieldWorksHQ

Item standard

OPSS.MUNI 201 Clearing, Close Cut Clearing, Grubbing, and Removal of Surface and Piled Boulders

Published by Ontario Provincial Standards (MTO / OPS)

Suggested unit

m2

Current version

Apr 2019

Official source
roadssite-prepcivilclearinggrubbingbouldersremovalstrippingmuni-201treetreesstump

Suggested sub-items

DescriptionUnit
Clearingha
Close cut clearingha
Grubbingha
Tree removal, 150 mm to 400 mm trunk diameterEach
Tree removal, over 400 mm trunk diameterEach
Stump removalEach

Related standards from Ontario Provincial Standards (MTO / OPS)

View Ontario Provincial Standards (MTO / OPS)'s full publisher profile

Reference only. Always verify before you specify.

This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.

Put this standard to work.

This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.