Item standard
CB 9D Standard Catch Basin and Cleanout Box Schedule of Installation 48 to 66 Inch RCP 60 to 78 Inch CMP
Published by Utah Department of Transportation (UDOT)
Suggested unit
Each
Related standards from Utah Department of Transportation (UDOT)
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
