Publisher profile
Alberta Infrastructure
Applies to: Alberta, Canada
Is this your organization? Raise a concern or correction
Item standards
- AI AIM Requirements ConsultantAsset Information Model (AIM) Requirements - Consultant
- AI AIM Requirements ContractorAsset Information Model (AIM) Requirements - Contractor
- AI AIM Requirements Design-BuildAsset Information Model (AIM) Requirements - Design-Build
- AI BIM COBie RequirementsBIM COBie Requirements
- AI BIM Requirements ConsultantBuilding Information Modeling (BIM) Requirements - Consultant
- AI BIM Requirements Design-BuildBuilding Information Modeling (BIM) Requirements - Design-Build
- AI Building Envelope Commissioning GuidelineBuilding Envelope Commissioning Guideline
- AI Consultant DeliverablesConsultant Deliverables
- AI Design Tip 01PERSIST
- AI Design Tip 02Sloped vs. Vertical Glazing
- AI Design Tip 03Green Roof Design
- AI Design Tip 04Building Integrated Photovoltaics
- AI Design Tip 05EIFS Assemblies
- AI Design Tip 06Understanding Insulation
- AI Design Tip 07Green Building Standards
- AI Design Tip 08Operable Partitions
- AI Design Tip 09Electric Vehicles
- AI Design Tip 10Deeper Greening
- AI Design Tip 11Well Building Standard
- AI Design Tip 12Rooftop Photovoltaics
- AI Design Tip 13Top Ten Design Things to Watch For
- AI Design Tip 14Footfall Furniture Movement Noise in Schools
- AI Design Tip 15The Energy Modeling Process
- AI Design Tip 17PVC Roof Membrane
- AI Design Tip 18Static Axial Compression Load Test for Pile Foundations
- AI Design Tip 19Classes of Construction Cost Estimates
- AI Design Tip 20Demand Control Ventilation
- AI Design Tip 21PDLC Glass (Smart Glass)
- AI Design Tip 22Facility Evaluation for Strategic Asset Management
- AI Design Tip 23Surge Protective Devices (SPDs) for Building Power Systems
- AI Design Tip 24Slip-Resistant Resilient Flooring
- AI Design Tip 26Real Property Governance Act (RPG)
- AI EMCS GuidelineEnergy Management Control Systems (EMCS) Guideline
- AI Flood Risk Management GuidelinesFlood Risk Management Guidelines for Location of New Facilities
- AI Geotechnical GuidelineGeotechnical Guideline
- AI Hazardous Materials Work ProcessHazardous Materials Work Process
- AI Project Cost FrameworkProject Cost Framework
- AI Security Guidelines and StandardsSecurity Guidelines and Standards
- AI Specification Preparation GuideSpecification Preparation Guide
- AI TDRTechnical Design Requirements for Alberta Infrastructure Facilities
- AI TDR 0.0General Requirements
- AI TDR 1.0Architecture
- AI TDR 10.0Landscape Developments
- AI TDR 11.0Facility Hazards
- AI TDR 12.0Digital Project Delivery
- AI TDR 2.0Building Envelope
- AI TDR 3.0Interior Design
- AI TDR 4.0Structural
- AI TDR 5.0Mechanical
- AI TDR 6.0Electrical
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
