Publisher profile
Arizona Department of Transportation (ADOT)
Applies to: Arizona, United States
Is this your organization? Raise a concern or correction
General provisions
Item standards
- 0-1Standard Abbreviations
- 0-2 (1/3)Plan Symbols (0-2 (1/3))
- 0-2 (2/3)Plan Symbols (0-2 (2/3))
- 0-2 (3/3)Plan Symbols (0-2 (3/3))
- 0-3 (1/2)Standard Definitions (0-3 (1/2))
- 0-3 (2/2)Standard Definitions (0-3 (2/2))
- 0-4Reference Documents and General Requirements
- 1-1 (1/2)Light Duty - Light Weight No. 5 and No. 7 Pull Box
- 1-1 (2/2)Light Duty - Light Weight No. 5 and No. 7 Slope Wall Body Pull Box Details
- 1-10Top of Barrier Junction Box Details (1-10)
- 1-11 (1/3)Heavy Duty Lighting No. 4 and No. 6 Pull Box (1-11 (1/3))
- 1-11 (2/3)Heavy Duty Lighting No. 4 and No. 6 Pull Box (1-11 (2/3))
- 1-11 (3/3)Heavy Duty Lighting No. 4 and No. 6 Pull Box Lid
- 1-12 (1-2)Precast Heavy Duty Lighting No. 4B and No. 6B Pull Box
- 1-12 (2-2)Precast Heavy Duty Lighting No. 4B and 6B Pull Box
- 1-2Heavy Duty No. 5 and No. 7 Straight Body Wall Pull Box Details
- 1-3Replacement Lid Sizing for Existing No. 5 and No. 7 Pull Boxes
- 1-4 (1/3)Typical Pull Box Installation and Wiring Details (1-4 (1/3))
- 1-4 (2/3)Typical Pull Box Installation and Wiring Details (1-4 (2/3))
- 1-4 (3/3)Typical Pull Box Installation Details
- 1-5 (1/2)Electrical Conduit Cover and Trench Requirements
- 1-5 (2/2)Conduit Expansion Couplings
- 1-6Conductor Requirements
- 1-7Traffic Signal IMSA Cable Color Codes
- 1-8 (1/2)Front of Barrier Junction Box
- 1-8 (2/2)Back of Barrier Junction Box
- 1-9Top of Barrier Junction Box Details (1-9)
- 10-1Miscellaneous Signal Mounting Parts
- 10-2Mast Arm Signal Plumbizer
- 10-3Signal Mounting Pole Plate Details
- 10-4Terminal Compartment, Side Mounted and Pole Top Mounted
- 11-1Type I Pedestrian Push Button Housing Assembly
- 11-2Can Style Pedestrian Push Button
- 12-1 (1/3)Advance Warning Flasher Pole Detail (12-1 (1/3))
- 12-1 (2/3)Advance Warning Flasher Pole Sign Mounting Details
- 12-1 (3/3)Advance Warning Flasher Pole Detail (12-1 (3/3))
- 13-1Sign Lighting Detail for Tubular Sign Structures
- 13-2Fuse Panel Details for Sign Lighting
- 13-3Placement of Lighting Fixtures for Overhead Signs
- 14-1 (1/3)High Pressure Sodium (HPS) Lamps (14-1 (1/3))
- 14-1 (2/3)High Pressure Sodium (HPS) Lamps (14-1 (2/3))
- 14-1 (3/3)High Pressure Sodium (HPS) Lamps (14-1 (3/3))
- 14-2Pedestrian Bridge Lighting Details
- 15-0 (1/3)General Notes (15-0 (1/3))
- 15-0 (2/3)General Notes (15-0 (2/3))
- 15-0 (3/3)General Notes (15-0 (3/3))
- 15-1 (1/6)Steel Pole Typical Details
- 15-1 (2/6)Steel Pole Foundation Details
- 15-1 (3/6)Steel Pole Attachment Details
- 15-1 (4/6)Wood Pole Typical Details (15-1 (4/6))
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
