Publisher profile
Defence Construction Canada (DCC)
Applies to: Canada
Is this your organization? Raise a concern or correction
General provisions
Item standards
- DCC Procurement Code of Conduct
- DCL 193EInstructions to Tenderers for Electronic Bidding
- DCL 243Insurance Conditions
- DND Asset Information Model (AIM) Technical RequirementsAsset Information Model (AIM) Technical Requirements
- DND Buildings LIDAR Data Capture Technical RequirementsBuildings LIDAR Data Capture Technical Requirements
- DND CAD/BIM Standard 2.3
- DND CAD/BIM Standard 2.3 Annex AAnnex A: Layers
- DND CAD/BIM Standard 2.3 Annex BAnnex B: Symbols
- DND Equipment Registry Survey Technical RequirementsEquipment Registry Survey Technical Requirements
- DND File Naming and Transmittal RequirementsFile Naming & Transmittal Requirements; DND Building Spatial Data Collection
- DND Floor and Room Numbering Standard
- DND General Floor Plan Technical RequirementsGeneral Floor Plan Technical Requirements
- DND General Site Plan Request for InformationGeneral Site Plan Request for Information
- DND Master Room and Space Classification ListMaster Room & Space Classification List
- DND Provisional Building and Land DefinitionsProvisional Building and Land Definitions
- DND RPSDW Digital Photo SpecRPSDW Digital Photo Spec
- DND Space Data Survey Technical RequirementsSpace Data Survey Technical Requirements
- DND Space Management Technical RequirementsSpace Management Technical Requirements
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
