Publisher profile
County of Elgin
Applies to: Elgin County, Ontario, Canada
Is this your organization? Raise a concern or correction
Item standards
- Elgin County Standard Contract Documents - Supplemental SpecificationsStandard Contract Documents - Supplemental Specifications
- Elgin County Supplemental Specifications - LandscapingSupplemental Specifications - Landscaping
- Elgin County Supplemental Specifications - Landscaping, Section 2.1Tree Removals
- Elgin County Supplemental Specifications - Landscaping, Section 2.2Tree Planting
- Elgin County Supplemental Specifications - Landscaping, Section 2.3Tree and Shrub Relocation
- Elgin County Supplemental Specifications - Landscaping, Section 2.4Penalty for Tree Damage
- Elgin County Supplemental Specifications - RoadsSupplemental Specifications - Roads
- Elgin County Supplemental Specifications - Roads, Section 2.1Painting Edge of Concrete Curb and Gutter Reveal
- Elgin County Supplemental Specifications - Roads, Section 2.2Asphalt Ramps
- Elgin County Supplemental Specifications - SewersSupplemental Specifications - Sewers
- Elgin County Supplemental Specifications - Traffic SignalsSupplemental Specifications - Traffic Signals
- Elgin County Supplemental Specifications - Traffic Signals, Part 3Traffic Signal Activation Checklist
- Elgin County Supplemental Specifications - Traffic Signals, Part 4Traffic Controller Tag Labelling
- Elgin County Supplemental Specifications - Traffic Signals, Section 2.1Traffic Signal Wiring
- Elgin County Supplemental Specifications - Traffic Signals, Section 2.2Mounting Equipment
- Elgin County Supplemental Specifications - Traffic Signals, Section 2.3Maintenance of Traffic
- Elgin County Supplemental Specifications - WaterSupplemental Specifications - Water
- Elgin County Supplemental Specifications - Water, Section 2.1Materials
- Elgin County Supplemental Specifications - Water, Section 2.2Tapping Sleeves and Valves
- Elgin County Supplemental Specifications - Water, Section 2.3Corrosion Protection
- Elgin County Supplemental Specifications - Water, Section 2.4Thermal Insulation
- Elgin County Supplemental Specifications - Water, Section 2.5Tracer Wire
- Elgin County Supplemental Specifications - Water, Section 2.6Drinking Water Quality Management System (DWQMS)
- L-01Tree Planting Detail
- R-01Driveway Apron Typical Section
- S-01Typical Sanitary Sewer Service Connection
- S-02Private Drain Connection Clean Out
- S-04Private Drain Connection Vertical Riser Installation
- S-05Precast 600mm x 840mm Curb Inlet Catchbasin
- S-06Catchbasin Inlet Details
- W-01Thrust Restraint for Watermain up to and including 300mm
- W-02Typical Offset Watermain
- W-03Fire Hydrant and Valve Box Detail
- W-04Watermain Service Installation
- W-06Standard 50mm Blow-Off
- W-07Magnesium Anode Installation
- W-09Tracer Wire Connection
- W-13Typical Turbine Water Meter Installation for 75mm to 200mm
- W-17Water Sampling Station Detail
- W-20Magnesium Anode Configuration for Various Metalic Fittings
- W-21Typical Insulation for Sewers and Watermains in Shallow Trenches
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
