Publisher profile
EPCOR Distribution and Transmission Inc.
Applies to: Edmonton, Alberta, Canada
Is this your organization? Raise a concern or correction
Item standards
- EDTI 60 00 07 00 12 001Right-of-Way Requirement for Single Phase Switching Cubicle, Single Phase Transformer or 3 Phase Transformer
- EDTI 60 00 07 00 12 002Right-of-Way Requirement for Single Phase Switching Cubicle, Single Phase Transformer or 3 Phase Transformer with 2.0m Gas Right-of-Way
- EDTI 60 00 07 00 12 005Right-of-Way Requirement for 3 Phase Switching Cubicle
- EDTI 60 00 07 00 12 006Right-of-Way Requirement for 3 Phase Switching Cubicle with 2.0m Gas Right-of-Way
- EDTI 60 00 07 00 60 001Single and Multiple Ground Rod Resistance Reading Process and Requirement
- EDTI 63 00 07 00 20 001Compression Die Reference Chart
- EDTI 63 00 07 00 23 001Fault Indicator Fibre Optic Cable Installation on Deadfront Switching Cubicles
- EDTI 63 00 07 00 37 001Duct Size for Primary Road Crossings and Risers
- EDTI 63 00 07 00 37 002Duct Size for Secondary Road Crossings and Risers
- EDTI 63 00 07 00 46 005Splice Pit Construction
- EDTI 63 00 07 00 47 002Installation & Pulling of XLPE and EPR Cables
- EDTI 63 00 07 00 48 005Termination of XLPE/EPR Cables Using 600 A Elbows
- EDTI 63 00 07 00 48 006Termination of XLPE/EPR Cable Using 200 Amp Elbows
- EDTI 63 00 07 00 48 007Termination of XLPE/EPR Cables Using 600 A Elbows for Distribution Automation
- EDTI 63 00 07 00 48 009Straight Splice for XLPE/EPR Cables
- EDTI 63 00 07 00 82 001Primary Underground Cables Used in Distribution Construction
- EDTI 65 00 07 00 23 003Switching Cubicle Anchoring Detail
- EDTI 65 00 07 00 60 001Grounding Connection Details for Switching Cubicles & Transformers
- EDTI 65 00 07 15 23 009Summary of 15 kV Dead Front Switchgear Schematic Information
- EDTI 65 00 07 15 23 030Installation of 15 kV 4-Way 3 Phase 600 Amp Deadfront Switching Cubicles for Distribution Automation
- EDTI 65 00 07 15 23 032Installation of 15 kV 4-Way 3 Phase 600 Amp Deadfront Switching Cubicles (All Variants)
- EDTI 65 00 07 15 23 132Installation of Precast Concrete Base for 4-Way 3 Phase 15 kV Switching Cubicle (All Variants)
- EDTI 65 00 07 25 23 009Summary of 25 kV Dead Front Switching Cubicle Schematic Information
- EDTI 65 00 07 25 23 030Installation of 25 kV 4-Way 3 Phase 600 Amp Deadfront Switching Cubicles for Distribution Automation
- EDTI 65 00 07 25 23 032Installation of 25 kV 4-Way 3 Phase 600 Amp Deadfront Switching Cubicles (All Variants)
- EDTI 65 00 07 25 23 132Installation of Precast Concrete Base for 4-Way 3 Phase 25 kV Switching Cubicle (All Variants)
- EDTI 66 00 07 00 20 001Cubicle and Transformer Cable Identification Tag
- EDTI 66 00 07 00 27 015Installation of Single Phase MSB or MNB Type Transformer
- EDTI 66 00 07 00 27 115Installation of Precast Concrete Base for Single Phase Transformers
- EDTI 66 00 07 00 46 0013 and 4 Party Utility Shared Trench
- EDTI 66 00 07 00 46 004Cable Bypass at Power Bases Service Pedestals & Street Light Bases
- EDTI 66 00 07 00 46 005Mechanical Protection for Reduced Clearance Direct Buried Cables
- EDTI 66 00 07 00 48 100Installation of Precast Concrete Base Over Splice Pits
- EDTI 66 00 07 00 48 175Sealing of XLPE/EPR Concentric Neutral and USEB90 (Secondary) Cable Ends
- EDTI 66 00 07 00 60 001Bonding Communications or Street Lighting Facilities within 3 Meters of Power Distribution Facilities (Cross - Bonding)
- EDTI 66 00 07 02 48 001Typical Service Box Power/CATV/TEL
- EDTI 66 00 07 08 48 001Secondary Service Cable Splice 600 V 2/C XLPE AL CN
- EDTI 66 00 07 15 23 014Installation of 15kV 4-Way Single Phase 200 Amp Deadfront Switching Cubicle
- EDTI 66 00 07 15 23 035Installation of 15 kV 4-Way 3 Phase 200 Amp Deadfront Switching Cubicle
- EDTI 66 00 07 15 23 114Installation of Precast Concrete Base for 4-Way 15 kV Single Phase 200 Amp Deadfront Switching Cubicle
- EDTI 66 00 07 25 23 114Installation of Precast Concrete Base for 4-Way 25 kV Single Phase 200 Amp Deadfront Switching Cubicle
- EDTI 66 DI 07 00 07 001Antenna Installation on Steel Pole
- EDTI Customer Connection GuideCustomer Connection Guide
- EDTI Interconnection GuideTechnical Requirements for Interconnection and Interoperability of Distributed Energy Resources on EPCOR's Electric Distribution System
- EPCOR Vol. 7City of Edmonton Design and Construction Standards Volume 7 Underground Power Distribution Systems
- EPCOR Vol. 7 Section 1General Requirements
- EPCOR Vol. 7 Section 2Design, Approvals, CCC, and FAC
- EPCOR Vol. 7 Section 3Trenching, Cabling and Installation of Bases
- EPCOR Vol. 7 Section 4Terminations / Termination Inspections / Cable, Equipment and Ground Grid Test Reports
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
