Publisher profile
Michigan Department of Transportation
Applies to: Michigan, United States
Is this your organization? Raise a concern or correction
General provisions
Item standards
- B-101-GDrain Casting Assembly Details
- B-102-DStandard Slope Paving Details
- B-103-FMolding, Bevel, Light Standard Anchor Bolt Assembly and Name Plate Details
- B-21-KBridge Railing, 2 Tube
- B-22-EBridge Railing, Thrie Beam Retrofit (R4 Type Bridge Railing)
- B-23-FBridge Railing, Thrie Beam Retrofit (Open Parapet Type Bridge Railing)
- B-25-LBridge Railing, Aesthetic Parapet Tube
- B-26-GBridge Railing, 4 Tube
- B-27-BBridge Railing, 3 Tube with Pickets
- B-28-ABridge Barrier Railing, Type 7
- B-29-ABridge Barrier Railing, Type 6
- B-32-DFencing for Pedestrian Structure Existing Open Parapet
- B-33-DFencing for Pedestrian Structure Existing Metal Railing-R4 Post
- B-34-CFencing for Pedestrian Structure Existing Metal Railing-R5 or R9 Post
- B-35-DFencing for Pedestrian Structure Existing Solid Parapet
- B-37-CFencing for Pedestrian 2 or 5 Tube Steel Railing
- B-38-DFencing for Pedestrian Structure Existing Type 4 & 5 Barrier
- B-40-AFencing for Bridge Railing, 4 Tube
- B-41-DFencing for Bridge Railing, Asethetic Parapet Tube
- B-42-AFencing for Bridge Railing, 3 Tube with Pickets
- B-50-ABridge Railing, Concrete Block Retrofit
- MDOT Section 1001Concrete Production Equipment and Facilities
- MDOT Section 1002Contractor Quality Control for Concrete
- MDOT Section 1003Quality Assurance (Acceptance) for Concrete
- MDOT Section 1004Portland Cement Concrete Mixtures
- MDOT Section 1005Mortar and Grout Mixtures
- MDOT Section 1006Patching, Repair, and Overlay Mixtures
- MDOT Section 101Terms, Format, and Definitions
- MDOT Section 102Bid Submission, Award, and Execution of Contract
- MDOT Section 103Scope of the Work
- MDOT Section 104Control of the Work
- MDOT Section 105Control of Materials
- MDOT Section 107Legal Relations and Responsibilities to the Public
- MDOT Section 108Prosecution and Progress
- MDOT Section 109Measurement and Payment
- MDOT Section 110Mobilization
- MDOT Section 201Clearing
- MDOT Section 202Removing Trees, Stumps, and Corduroy
- MDOT Section 203Removing Drainage Structures, Culverts, and Sewers
- MDOT Section 204Removing Miscellaneous Structures and Materials
- MDOT Section 205Roadway Earthwork
- MDOT Section 206Excavation and Backfill for Structures
- MDOT Section 207Obliterating Roadway
- MDOT Section 208Soil Erosion and Sedimentation Control
- MDOT Section 209Project Cleanup
- MDOT Section 301Subbase
- MDOT Section 302Aggregate Base Course
- MDOT Section 303Open-Graded Drainage Course
- MDOT Section 304Rubblizing Portland Cement Concrete Pavement
- MDOT Section 305HMA Base Crushing and Shaping
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
