Publisher profile
New Hampshire Department of Transportation (NHDOT)
Applies to: New Hampshire, United States
Is this your organization? Raise a concern or correction
General provisions
Item standards
- CR-1Granite Curb Details
- CR-2Curb Details
- DL-1Roadside Delineation
- DL-2Interchange Delineation
- DL-3Milled Rumble Stripes (Shoulders) (DL-3)
- DL-4Milled Rumble Stripes (Shoulders) (DL-4)
- DL-5Milled Rumble Stripes (Shoulders) (DL-5)
- DL-6Milled Rumble Stripes (Centerline) (DL-6)
- DL-7Milled Rumble Stripes (Centerline) (DL-7)
- DL-8Milled Rumble Stripes (Centerline) (DL-8)
- DP-1Drainage Pipe Details
- DR-1Grate and Frame Details
- DR-2Grate and Frame, M.H. Cover and Pavement Depression Details
- DR-3Precast Concrete Median Barrier Drainage Details
- DR-4DI-DB, Underdrain Flushing Basin and Polyethylene Liner Details
- DR-5Precast Reinforced Concrete C.B., D.I. and M.H.
- ES-1End Sections for Corrugated Steel and Reinforced Concrete Pipes
- EW-1Earthwork - Muck Excavation
- FN-1Woven Wire Fence
- FN-2Chain Link Fence
- GR-131 Inch Mid-Splice Beam Guardrail Standard Section - Steel Posts and Hardware Details
- GR-10Beam Guardrail (Terminal Unit Type G-2) (Mash Mid-Splice)
- GR-11Beam Guardrail - Thrie Beam Double Faced (Wood Posts)
- GR-12Beam Guardrail - Thrie Beam Double Faced (Steel Posts)
- GR-13Beam Guardrail - Thrie Beam Single Faced (Wood Posts)
- GR-14Beam Guardrail - Thrie Beam Single Faced (Steel Posts)
- GR-15Precast Concrete Barrier 42 Inch F-Shape (Double-Faced)
- GR-16Transition F-Shape Barrier
- GR-17Transition F-Shape Barrier and Guardrail (Wood Posts)
- GR-18Transition F-Shape Barrier and Guardrail (Steel Posts)
- GR-19Single Slope Barrier
- GR-2Beam Guardrail Standard Section - Steel Posts and Hardware Details
- GR-20Transition Single Slope Concrete Barrier, Precast
- GR-21Transition Single Slope Concrete Barrier and Guardrail (Wood Posts)
- GR-22Transition Single Slope Concrete Barrier and Guardrail (Steel Posts)
- GR-23Portable Concrete Barrier 10 foot
- GR-24Portable Concrete Barrier (1 of 2) (12.5 ft-MASH)
- GR-25Portable Concrete Barrier (2 of 2) (12.5 ft-MASH)
- GR-2ABeam Guardrail Standard Section - Wood Posts and Hardware Details
- GR-3Preferred Platform for Energy Absorbing Guardrail Terminal (EAGRT)
- GR-4Alternative Platform for Energy Absorbing Guardrail Terminal (EAGRT)
- GR-5Beam Guardrail (Terminal Type E-3) (Mash Mid-Splice)
- GR-6Beam Guardrail (Terminal Type E-3) (Mash Mid-Splice) Hardware Details
- GR-7Beam Guardrail (Terminal Type E-3) (Mash Mid-Splice) - 30 MPH
- GR-8Beam Guardrail (Terminal Type E-3) (Mash Mid-Splice) - 40 MPH
- GR-9Beam Guardrail (Terminal Type E-3) (Mash Mid-Splice) - 45 MPH
- HR-1Handrail Details
- HR-2Concrete Bound and Steps
- HW-1Headwall Details
- HW-2Headwall Details (45 Degree Wings)
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
