Publisher profile
Ontario Regional Common Ground Alliance (ORCGA)
Applies to: Ontario, Canada
Is this your organization? Raise a concern or correction
Item standards
- CCGA Practice 1-1Planning Utility Corridors
- CCGA Practice 1-10Constructability Review
- CCGA Practice 1-11Use of Qualified Contractors
- CCGA Practice 1-12Pre-Bid Conferences
- CCGA Practice 1-13Contact between the Designer/Engineer and Potential Contractors during the Pre-Bid/Bid Phase
- CCGA Practice 1-14Contact between the Designer and the Contractor during Construction
- CCGA Practice 1-15As-Built Drawings
- CCGA Practice 1-16Sewer/Water Main Service Connections
- CCGA Practice 1-17Sewer Main and Lateral Infrastructure
- CCGA Practice 1-18Demolition Permit Application Process
- CCGA Practice 1-2The Protection of Survey Infrastructure
- CCGA Practice 1-3Inclusion of Utility Infrastructure on Development Plans
- CCGA Practice 1-4Gathering Information for Design Purposes
- CCGA Practice 1-5Subsurface Utility Engineering (SUE)
- CCGA Practice 1-6Identifying Existing Facilities in Planning and Design
- CCGA Practice 1-7Utility Coordination
- CCGA Practice 1-8Underground Facilities should be Locatable
- CCGA Practice 1-9Follow All Applicable Codes, Regulations, and Owner Standards
- CCGA Practice 2-1Pro-active Public Awareness, Education and Damage Prevention Activities
- CCGA Practice 2-10Printed Ticket Recall
- CCGA Practice 2-11Documented Operating Procedures, Policies, and Manuals
- CCGA Practice 2-12Documented Owner Verification of Data Submitted by Facility Owners
- CCGA Practice 2-13Flexibility for Growth and Change
- CCGA Practice 2-14Meeting Between the Excavator and Facility Owner(s) Initiated by Notification Service
- CCGA Practice 2-15Notification Service Accepts Notifications from Designers
- CCGA Practice 2-16Locate Request
- CCGA Practice 2-17Practices to Reduce Over-Notifications
- CCGA Practice 2-18Disaster Recovery
- CCGA Practice 2-19Remote User Interface
- CCGA Practice 2-2Specifically Defined Geopolitical Service Area with No Overlap
- CCGA Practice 2-20Accept Multiple Reference Points for Locate Requests
- CCGA Practice 2-21Notification Service Security
- CCGA Practice 2-22Hardware Designed to Tolerate a Single Point of Failure
- CCGA Practice 2-23Notification Quality Standards
- CCGA Practice 2-24Notification Service Mapping
- CCGA Practice 2-25Notification Service is the Interface between Excavators and Registered Facility Owners for the Purpose of Receiving Locate Requests
- CCGA Practice 2-26All Buried Facility Owners are Members of the Notification Service
- CCGA Practice 2-27Excavators Contact the Notification Service Before Excavating
- CCGA Practice 2-28Notification Service Advises Excavators to Contact Non-Members Directly
- CCGA Practice 2-29Notification Service Accepts Locate Requests in Both Official Languages
- CCGA Practice 2-3Formal Agreements with Members
- CCGA Practice 2-30Notification Service is the Interface between Excavators and Registered Facility Owners for the Purpose of Updating the Status of Locate
- CCGA Practice 2-31Notification Service Reminds Excavators Digging on Private Property that They Should Advise the Notification Service if They are Aware of Any
- CCGA Practice 2-32The Notification Service is the Interface between Excavators and Registered Facility Owners for the Purpose of Reporting Buried Facilities Not
- CCGA Practice 2-4Notification Service Governance
- CCGA Practice 2-5Single Toll Free Number with North-American Access
- CCGA Practice 2-6Hours of Operation
- CCGA Practice 2-7Documented Record of All Locate Requests
- CCGA Practice 2-8Retention of Voice and Electronic Records According to Applicable Statutes
- CCGA Practice 2-9Requester Feedback
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.