Publisher profile
South Carolina Department of Transportation (SCDOT)
Applies to: South Carolina, United States
Is this your organization? Raise a concern or correction
Item standards
- 000-000-00SCDOT Signature Cover Page & Introduction
- 000-005-01General Information About the Standard Drawing Book (000-005-01)
- 000-005-02General Information About the Standard Drawing Book (000-005-02)
- 000-005-03General Information About the Standard Drawing Book (000-005-03)
- 100-000-00Division 100 - General Provisions, Notes & Instructions
- 100-105-00Symbols & Abbreviations (Road)
- 100-110-00Symbols & Abbreviations (Utility)
- 100-115-00Symbols & Abbreviations (Survey)
- 150-000-00Geometry
- 150-205-00Superelevation (Geometry)
- 150-210-00Superelevation (Typical Road Widening Method)
- 150-605-00Cul-de-sac Details
- 203-000-00Excavation
- 203-105-00Excavation (Muck)
- 203-405-00Excavation (Flattening Cut Slopes)
- 203-905-00Excavation Associated Work (Mailbox Placement)
- 205-000-00Embankment Construction (205-000-00)
- 205-105-00Embankment (Safety Grading at Underpass)
- 205-110-MOEmbankment (Median Earth Mound Protection at Structure)
- 403-000-00Pavement (HMA Surface Course)
- 403-105-00HMA Surface Course (Ditch Paving) Valley Gutter, Flume, Drainage
- 403-205-01HMA Surface Course (Ditch Paving & Flume at Safety Shape with Concrete Trans
- 403-205-02HMA Surface Course (Ditch Paving & Flume at Safety Shape with Concrete Tran
- 403-210-00HMA Surface Course (Ditch Paving & Flume at Vertical Parapet on Bridge)
- 601-000-00Traffic Control
- 601-005-00Widening Projects New Roadway Construction Primary Routes
- 601-010-00Widening Projects Median Areas Interstate Routes
- 601-015-00Widening Projects Existing Roadway Rehabilitation Primary Routes
- 601-020-00Widening Projects Traf Relocation / Separation Primary Routes
- 601-105-00Materials Storage Interstate Routes
- 601-110-00Materials Storage Primary & Secondary Rural Roadways
- 601-115-00Materials Storage Primary & Secondary Urban Roadways
- 601-150-00LOADING/UNLOADING Equipment Interstate Routes
- 601-205-01Protection of Excavations Adjacent to Roadway
- 601-205-02Protection of Excavations Right Quadrant of Intersection Type Iii Barricades
- 601-205-03Protection of Excav. Right Quadrant of Inters. Plastic Water-filled Barrier
- 601-205-04Protection of Excav. Right Quadrant of Inters. Temp Concrete Barrier
- 601-205-05Protection of Excavation Center of Intersection Type Iii Barricades
- 601-205-06Protection of Excavation Center of Intersection Plastic Water-filled Barrier
- 601-205-07Protection of Excavation Center of Intersection Temp Concrete Barrier
- 602-000-00Portable Sign Supports
- 602-005-00Construction Signing - Temp Portable Sign Supports Installation & Placement
- 604-000-00Barricades
- 604-005-00Barricades Type II & Ground Mounted Type Iii Installation
- 605-000-00Construction Signing
- 605-005-01Construction Signing - Ground Mount Assembly - U-channel Post - Breakaway
- 605-005-02Construction Signing - Ground Mount Assembly - U-channel Post - U-channel Splice
- 605-005-03Work Zone Sign Square Tube Posts 12GA - 14GA Sign Sup 12GA Ground SUPP/DIRECT IM
- 605-005-04Work Zone Sign Square Tube Posts Single Post Typ Install Sign Panel 14SF or Less
- 605-005-05Work Zone Sign Square Tube Posts Single Post 12GA Sign Supp 7GA Breakaway Anch
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
