Publisher profile
Toronto Hydro-Electric System Limited
Applies to: Toronto, Ontario, Canada
Is this your organization? Raise a concern or correction
Item standards
- 30-1110Cobra Head Luminaire Selection Table
- 30-1120Acorn Luminaire Selection Table
- 30-1300Secondary Bus Cables Selection Cable
- 30-1600Street Lighting Brackets Details
- 30-3200Luminaire Fuse Assembly Installation Detail
- 30-3600Overhead 120 V Supply to Pole-Mounted Luminaire
- 30-3700Underground 120 V Supply to Pole-Mounted Luminaire at the First Pole with In-Pole Circuit Breaker
- 30-3800Underground 120 V Supply to Pole-Mounted Luminaire
- 30-3820Underground Supply Duct into Pole Aperture
- 30-4100Concrete Pole with Acorn Luminaire
- 30-4110Acorn Luminaire with Bracket - Typical Installation on Concrete, Wood or Steel Pole
- 30-4210Aluminium Pole with Cobra Head Luminaire
- 30-4220Concrete Pole with Cobra Head Luminaire
- 30-4240Cobra Head Luminaire with Bracket - Typical Installation on Concrete, Wood or Steel Pole
- 30-9100Lane Lighting Bracket - Acorn or Cobra Head Luminaire on Wood Pole
- Clearances for Swimming Pools
- Clearances to Overhead Electrical Infrastructure
- Clearances to Underground Electrical Infrastructure
- Conditions of Service
- Reference 1 - Economic Evaluation Model for Distribution System ExpansionReference 1. Economic Evaluation Model for Distribution System Expansion
- Reference 3 - Distributed Energy Resource RequirementsDistributed Energy Resource Requirements
- Reference 4 - Requirements for the Design and Construction of Customer-Owned High Voltage SubstationsReference 4. Requirements for the Design and Construction of Customer-Owned High Voltage Substations
- Reference 5a - Requirements for the Design and Construction of Customer-Owned StructuresReference 5a. Requirements for the Design and Construction of Customer-Owned Structures
- Reference 5b - Construction Standards Referenced in Requirements for the Design and Construction of Customer-Owned StructuresReference 5b. Construction Standards Referenced in Requirements for the Design and Construction of Customer-Owned Structures
- Reference 6 - Metering Requirements 750 Volts or LessReference 6. Metering Requirements 750 Volts or Less
- Reference 7 - Metering Requirements for 13.8kV and 27.6kV Customer-Owned SubstationsReference 7. Metering Requirements for 13.8kV and 27.6kV Customer-Owned Substations
- Reference 9 - Electric Vehicle Charging Connection Requirements for Toronto Hydro CustomersReference 9. Electric Vehicle Charging Connection Requirements for Toronto Hydro Customers
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
