Publisher profile
Town of Milton
Applies to: Milton, Halton Region, Ontario, Canada
Is this your organization? Raise a concern or correction
General provisions
Item standards
- 01-11.0111.0 M Road Allowance - Laneway
- 01-16.0116.0 M Road Allowance - Minor Local
- 01-18.0118.0 M Road Allowance - Major Local
- 01-22.0122.0 M Road Allowance - Minor Collector
- 01-26.0126.0 M Road Allowance - Major Collector
- 01-35.0135.0 M Road Allowance - Arterial (Without Median)
- 01-35.0235.0 M Road Allowance - Arterial (With Median)
- 02-01.01Urban Cul-de-sac
- 02-02.01Right-of-Way Widening - Arterial and Collector Intersections
- 03-01.01Curb and Gutter - 2 Stage
- 03-02.01Subdrain for Curb/Roads
- 03-03.01Asphalt Widening for 90 Degree Bends
- 03-04.01Speed Bump
- 03-04.02Speed Cushions
- 03-05.01Cushioned Crosswalk Plan
- 03-05.02Cushioned Crosswalk Details
- 03-06.01Raised Crosswalk Plan
- 03-06.02Raised Crosswalk Detail
- 03-07.01Temporary Plating for Trenches and Pits
- 03-07.02Trench Restoration
- 04-00.01Construction Access Barrier
- 04-01.01Urban Site Entrance (Unsignalized)
- 04-01.02Urban Site Entrance with Cycle Track Crossing (Unsignalized)
- 04-02.01Rural Site Entrance (with Culvert)
- 05-01.01Residential Lot Servicing
- 05-02.01Common Trench for Storm and Wastewater
- 05-03.01Sump Pump Discharge Details
- 05-04.01Storm Connection to Municipal Right-of-Way
- 05-04.02Rear-Yard Catchbasin (with PVC Lead) Installation Detail
- 06-01.01Sample Lot Grading Plan (Urban Subdivision)
- 06-01.02Sample Lot Grading Plan (Urban Infill)
- 06-02.01Sample Lot Grading Plan (Rural Development)
- 06-03.01Urban Lot Grading - Split Drainage
- 06-03.02Urban Lot Grading - Back to Front Drainage
- 06-03.03Urban Lot Grading - Lookout/Walkout Drainage
- 07-01.01Armour Stone Retaining Wall
- 08-01.01SWM Facility Staff Gauge Installation
- 09-01.01Woodlot Mulch Trail
- 09-01.02Limestone Screenings Trail
- 09-01.03Asphalt Trail
- 09-01.04SWM Pond Asphalt Access Road/Trail
- 09-01.05Concrete Paving
- 09-01.06Unit Pavers
- 09-01.07Sidewalk with Cycle Track
- 09-02.01Trail Access P-Gates (Layout)
- 09-02.02Trail Access P-Gates (Elevation)
- 09-03.01Concrete Walkway (Street to Street)
- 09-04.01CSP Trail Culvert
- 10-01.00Contractor's Temporary Fencing
- 10-01.01Temporary Protection Fencing
Approved products
11 products carry a Town of Milton approval.
- Aluminum Sign Support Pole - Base MountedTP10-423A-AB-150Sentinel Pole and Traffic Equipment Limited
- Aluminum Traffic Signal Pole - Base MountedTP12-645C-AB-242, TP15-645C-AB-242, TP19-866C-AB-292, TP19-1080E-AB-406, ET35-845E-AB-292, ET35-1055E-AB-406Sentinel Pole and Traffic Equipment Limited
- Asphalt Rejuvenating SealantReclamiteTricor Refining, LLC
- Optical Emergency Vehicle Pre-Emption DetectorOpticom3M Canada
- Traffic Signal Head Mounting Bracket - Double ArmEDA-300Sentinel Pole and Traffic Equipment Limited
- Traffic Signal Head Plumbizer HangerAP-42830Sentinel Pole and Traffic Equipment Limited
- Traffic Signal Mast ArmTR10SMA, TR15SMA, TR20SMAThomas & Betts
- Warm Mix Asphalt Chemical AdditiveWarmGrip N1Arkema - Road Science
- Warm Mix Asphalt Chemical AdditiveEvotherm M1Ingevity
- Warm Mix Asphalt Chemical AdditiveZycotherm SP2Zydex
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
