Publisher profile
Town of Niagara-on-the-Lake
Applies to: Niagara-on-the-Lake, Niagara Region, Ontario, Canada
Is this your organization? Raise a concern or correction
Item standards
- By-law No. 3941-05Site Alteration By-law
- NOTL 3.1Standard Service Connection Location
- NOTL 3.2Water Meter Chamber Detail - 16mm, 19mm or 25mm
- NOTL 3.3Water Meter Chamber Detail - 38mm or 50mm
- NOTL 3.4Water Meter Chamber Detail - 100mm to 250mm
- NOTL 3.5Water Sampling Station
- NOTL 3.6Valve Location Report
- NOTL 3.7Service Card
- NOTL 3.8Hydrant Clearance Zone
- NOTL 4.1Sanitary Cleanout Detail
- NOTL By-law 1873-87Policy and Procedures for the Design, Construction and Maintenance of Entranceways onto Municipal Roads
- NOTL Cross-section No. 1Urban Local Residential (Curb and Gutter)
- NOTL Cross-section No. 4Roadway with Minimal Shoulders and Swales
- NOTL Cross-section No. 5Roadway with Minimal Shoulders, Swales and Underdrain
- NOTL Cross-section No. 6Gravel Shoulder for Parking Roadside Drainage with Catchbasin
- NOTL Landscape GuidelinesLandscape Guidelines for Development Applications, Niagara-on-the-Lake
- NOTL Municipal Engineering StandardsMunicipal Engineering Standards
- NOTL PW-RDS-009AUrban Street Design
- NOTL Standard Utility Location Plan - 15m ROWStandard Utility Location Plan (15m R.O.W./8.5m Pavement - New Subdivision)
- NOTL Standard Utility Location Plan - 18m ROWStandard Utility Location Plan (18m R.O.W./8.5m Pavement - New Subdivision)
- NOTL Standard Utility Location Plan - 20m ROWStandard Utility Location Plan (20m R.O.W./8.5m Pavement - New Subdivision)
- NOTL Standard Utility Location Plan - 23m ROWStandard Utility Location Plan (23m R.O.W./8.5m Pavement - New Subdivision)
- NOTL Standard Utility Location Plan - 26m ROWStandard Utility Location Plan (26m R.O.W./8.5m Pavement - New Subdivision)
- NOTL Standard Utility Location Plan - Existing Serviced Urban AreaStandard Utility Location Plan (Existing Serviced Urban Area)
- NOTL Standard Utility Location Plan - Proposed Rural AreaStandard Utility Location Plan (Proposed Rural Area)
- NOTL Street Tree GuidelinesStreet Tree Guidelines
- PW-DRA-004ALandscape and Maintenance Guidelines for Stormwater Management Ponds and Facilities
- PW-DW-LM-011-001New Watermain Commissioning Checklist
- PW-DW-MIS-009-001Compliance Information for Contractors
- PW-DW-SOP-011-018Commissioning of New Watermains Procedure
- Tree Protection and Preservation Guideline
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
