Publisher profile
Township of Langley
Applies to: Langley Township, Metro Vancouver, British Columbia, Canada
Is this your organization? Raise a concern or correction
Item standards
- Bylaw No. 5382 Schedule AMinimum Service Level Standards
- Bylaw No. 5382 Schedule BDesign Criteria
- Bylaw No. 5382 Schedule CConstruction Requirements and Specifications
- Guidelines to Contractor and Consultant
- TLD 01Storm Flow Control Manhole
- TLD 02Storm Flow Control Chamber
- TLD 03Outlet Structure
- TLD 04Swale
- TLD 05French Drain
- TLD 06Exfiltration Trench
- TLD 07Rock Pit
- TLD 08Drainage Drywell Installation
- TLD 09Storm Sewer Service Connection
- TLD 10Storm Sewer Service Connection to Open Ditch and Drain
- TLD 11Curb Inlet Catch Basin
- TLD 12(a)Individual Lot Infiltration Facility Outside of Driveway
- TLD 12(b)Individual Lot Infiltration Facility Under Driveway
- TLD 12(c)Individual Lot Infiltration Facility
- TLG 01Typical Lot Service Connection
- TLG 02Sample Service Record Card
- TLG 03Right-Of-Way Access
- TLG 04Manhole Frame and Cover
- TLG 05Heavy Industrial Area Of NW Langley - Overhead Distribution Wiring Permitted
- TLG 06Utility Trench for Rigid Pipe
- TLP 01Bench Installation
- TLP 02Picnic Table and Pad Installation
- TLP 03Rear Yard Boulevard Inset Planting Sequence
- TLP 04Rain Garden Bollard
- TLP 05Fence Layout - Rear and Side Yard
- TLP 06Fence - Rear Yard on Greenway / Local
- TLP 07Fence - Chainlink
- TLP 08Fence Installation - Front Greenway
- TLP 09Fence - Access Barrier
- TLP 10Fence Installation - Low Flow Channel
- TLP 11Fence Installation - Paige Wire with Single Rail
- TLP 12Fence - Streamside
- TLP 13Bollard at Greenway Crossings
- TLP 14Wood Notes
- TLP 15Sign Post Installation
- TLP 16Multi-Stream Receptacle Concrete Pad
- TLP 17Bike Rack Installation
- TLP 18Asphalt Trail Construction
- TLP 19Granular Trail Construction
- TLP 20Rigid Grass - Emergency Access
- TLP 21Shrub and Groundcover Planting Installation
- TLP 22Tree Planting Notes
- TLP 23Tree Planting Detail - Softscape
- TLP 24Tree Installation Detail in Paved Boulevard
- TLP 25Typical Planted Median Installation
- TLP 26Typical Tree Setbacks / Clearances
Approved products
12 products carry a Township of Langley approval.
- Air/Vacuum Release Valve140CAPCO Valve & Primer Corp. (DeZURIK)
- Catch Basin FrameB24Dobney Foundry Ltd.
- Catch Basin GrateB23Dobney Foundry Ltd.
- Curb Stop BoxD10Dobney Foundry Ltd.
- Fire HydrantM93 BrigadierClow Canada
- Fire HydrantCenturyCanada Valve (Darling)
- Fire HydrantC71P-H105Terminal City Iron Works Ltd.
- Hydrodynamic SeparatorStormceptorStormceptor
- Mainline Butterfly ValveLionseal IIIMueller Co. (Mueller Canada)
- Resilient Seated Gate ValveA2362Mueller Co. (Mueller Canada)
Reference only. Always verify before you specify.
This directory is compiled from publicly available sources and may contain errors, omissions, or out-of-date entries. FieldWorks does not publish, approve, certify, or endorse any standard or product; approval listings are reproduced from the issuing authority's own published lists. Confirm the current edition with the publisher or authority before relying on it in a contract, and use the flag buttons in the directory to report anything that looks wrong. Use of the directory is subject to our Terms of Service, including the prohibition on bulk extraction and automated scraping.
Put this standard to work.
This same search is built into the FieldWorks Item Specification Composer, where a pick becomes a tender item with the reference, unit, and special provision already wired.
